Replace Oracle Agile end-of-life fear with a plan you can observe
Objections to leaving A9 are usually about risk. Schedules, audits, and daily flow all feel exposed. A coexistence plan lowers the temperature: run A9 and Aras in parallel, verify the mirror, go live on essentials, then expand and retire A9 when the operating picture is complete. It’s a managed evolution, not a jump.
Phase zero: mirror and verify
Begin by mirroring A9 data into Aras. Validate high value fields—lifecycle state and phase, where used links, affected item behavior—so mapping surprises are handled now, not during a cutover weekend. Confidence grows because evidence is visible and reconcilable.
Phase one: go live on essentials
Stand up a production ready core: parts and bill of materials (BOMs), documents and CAD, change control, collaboration, permissions, and viewing. The aim isn’t speed for its own sake; it’s early momentum that lets people do real work in the new environment while A9 remains available for history. That early rhythm shortens the path to steady state productivity.
Phase two: expand with intent
Add the capabilities that move the needle—quality processes, supplier collaboration, manufacturing planning, requirements, simulation traceability. Because the model-based, low-code platform, these steps are configuration driven and designed to carry forward through upgrades. You’re extending the same backbone rather than bolting on point tools.
Phase three: retire A9 to read only
When the operating picture is validated and complete, switch A9 to read only for audits. Teams continue on a foundation built for change, while historical evidence remains intact. That’s the difference between a smooth handoff and a risky deadline.
Enablement that respects real schedules
A pragmatic training cadence—interface and parts, BOMs, documents/CAD, sourcing, change, permissions, admin basics—delivered in the same sequence as scope goes live, builds confidence without pausing release trains. People learn as they work, not before they can work.
Proof, not promises
A plan measured in weeks creates space to demonstrate outcomes: faster reviews in the browser, cleaner signoff trails, supplier collaboration without exposing native CAD. See how modern PLM software makes those outcomes visible, so the debate about dates gives way to evidence that the organization can see.