Integrated Project Management System (IPMS) is SteepGraph’s project and program management offering for organizations running complex engineering and research programs on the Aras platform. IPMS brings project planning, execution, data governance, reporting, and collaboration into a single, governed digital backbone—eliminating fragmented tools, manual spreadsheets, and disconnected workflows. It was shaped and validated in collaboration with MIT Lincoln Laboratory, where multi-phase, compliance-driven, and DARPA-funded R&D programs demand tight control over schedules, deliverables, and engineering configuration data.
IPMS connects project structures, deliverables, engineering items, and documents into a single, governed model:
Project Data Management
The Project Data Management module is the foundation of IPMS. It connects projects to the underlying engineering and business objects in Aras (Parts, Documents, CAD, Requirements, Changes, etc.) and packages them into coherent “project data sets.” With project team–based access control, sensitive or export-controlled projects can be strictly isolated, while still allowing efficient collaboration inside the approved team.
Key capabilities include:
● Project / Product Data Exporter – Exports complete project metadata, structures, and files into a single package for customers, vendors, or internal reviews (e.g., sponsor reporting, joint program reviews).
● Project Team–Based Data Access – Restricts and filters data based on project membership and role, supporting customer-specific or ITAR/export-controlled initiatives.
● Linked Engineering Objects – Direct linkage of Parts, Documents, CAD items and other Aras ItemTypes to projects and deliverables.
● Controlled Sharing – Ability to share curated “views” of project data without exposing the entire database.
Project Reporting
The Project Reporting module leverages Aras project data to provide a comprehensive reporting layer for IPMS. It aggregates milestones, tasks, deliverables, resource allocations, and timesheets into ready-made reports and configurable pivot-style views. Program managers get both high-level status and drill-down detail without exporting data to external tools.
Key capabilities include:
● Project Management Reports – Standard reports for milestones, activities, resource load, capacity planning, timesheets, and equipment usage.
● Weekly Progress KPI Report – Time-boxed KPI views tracking maturity of tasks, requirements, parts, documents, and deliverables.
● Pivot Table / Ad-hoc Views – Excel-like pivot and filter capabilities from within Aras on project-related data.
● Multi-Project / Program Roll-Up – Cross-project reporting for portfolio and program-level visibility.
Project Template Management
The Project Template Management module turns proven project patterns into governed templates that can be reused across business units, labs, or customers. Templates can include WBS structures, activities, checklists, SOPs, reference documents, and mapped deliverables. They are importable/exportable across tenants or environments, supporting both global standardization and local tailoring.
Key capabilities include:
● Project Template Import/Export – Move templates between environments (e.g., DEV → PROD or site-to-site) via AML.
● Template Enhancements – Enrich templates with SOPs, checklists, reference docs, and expected deliverables.
● Template Governance – Versioning, approval, and controlled update process for templates.
Project Planning
The Project Planning module provides a rich planning environment on top of Aras Project Management. It links schedule activities to deliverables, SOPs, and checklists, while supporting multi-level project structures and cross-project roll-up. It also enables workflows to be attached directly to activities, ensuring that critical reviews and approvals are part of the plan, not an afterthought.
Key capabilities include:
● Scheduling Algorithm & Critical Path Calculation – Critical-path scheduling aligned with MS Project / Primavera standards.
● Attach Workflow to Project Activity – Embed review/approval workflows directly into the project schedule (e.g., design reviews, gate decisions).
● Deliverable Status & Required Checks – Verify mandatory deliverables before activity or phase closure.
● Project Structure with Deliverables, Activity Checklists & SOPs – Unified view that ties WBS tasks to the SOPs/checklists they must follow.
● Create Sub-WBS from Project Template – Rapidly build new WBS branches based on existing templates.
● Multi-Level Project Management & Project Import/Export – Support hierarchical project structures and reuse of full plan configurations.
Project Execution
The Project Execution module manages what happens after planning: baselines are captured, execution status is updated, and deviations are visible in real time. It provides visual status cues, variance calculations, streamlined completion dialogs, and contextual sign-off. Meetings and minutes of meeting (MoM) are integrated directly with project activities, ensuring that decisions and follow-ups are traceable.
Key capabilities include:
● Project Baseline & Baseline Compare – Capture and compare schedule baselines to track scope and timing changes.
● Project Schedule Variance Calculation – Highlight tasks with schedule slippage and variance from baseline.
● Project Activity Status Color Coding – Visual status cues (e.g., on-time, at-risk, late) for fast at-a-glance assessment.
● Redesigned Activity Completion Dialog – Simplified completion with integrated checklists/SOPs and deliverables check.
● Item Context Workflow Signoff – Contextual sign-off on activities and related items (e.g., documents, changes).
● Kanban Dashboard – Visual board for tracking in-progress work and bottlenecks.
● Meetings & MoM Management – Link meetings and minutes directly to projects, actions, and activities.
Task Management
The Task Management module is the user-facing layer that turns project plans and workflows into concrete, actionable work. Rather than forcing users to navigate through multiple projects and item types, it aggregates tasks, approvals, and action items into a single workspace. It supports both personal task lists and manager views for coordinating team workload.
Key capabilities include:
● Task Management – Centralized list of tasks and workflow steps assigned to a user, with filters by project, priority, and due date.
● My Actionables – Consolidated view of all pending actions from workflows, project activities, and MoM follow-ups.
● Select Next Owner on Promote – Ability for users to directly assign the next responsible owner when promoting items or tasks.
● Integration with Meetings & MoM – Automatically creates tasks/action items from meeting minutes and links them back to projects/activities.
● Role-Based Views – Tailored views for project managers, engineers, and functional leads.
From a business perspective, IPMS:
● Reduces manual effort for planning, status reporting, and cross-project aggregation by providing ready-made reports and templates.
● Improves schedule adherence and reduces overruns via explicit baselines, variance tracking, and gate checks on deliverables.
● Strengthens governance and compliance by embedding SOPs, checklists, and required artifacts into everyday project workflows.
● Provides program managers with a single, integrated view across engineering, documentation, and project activities—particularly valuable in multi-partner, export-controlled, and DARPA/DoD-style environments.
For Program / Project Managers
● Multi phase R&D program governance – Manage large, multi-year programs with clear phase gates, required deliverables, and auditable baselines (e.g., DARPA-funded research, internal technology demonstrators).
● Standardized project templates across labs and teams – Capture best-practice WBS, SOPs, checklists, and review workflows from successful projects and reuse them for new efforts, reducing ramp-up time and variability.
● Portfolio-level visibility and reporting – Generate cross-project views of milestones, progress, and risk; quickly answer “what’s late,” “what’s blocked,” and “what is ready for review” without manually consolidating spreadsheets.
● Schedule risk and variance management – Use baselines, critical-path visibility, and variance calculations to detect slippage early, reallocate resources, and communicate impact to sponsors.
For Engineering and Functional Leads
● Integrated engineering & project data – Link parts, CAD, requirements, and documents directly to project activities and deliverables, so engineers always know the project context and managers see real technical status.
● Cross-project reuse and variant projects – Use templates, import/export, and multi-level project structures to spin off related projects (e.g., new configurations or follow-on experiments) while maintaining traceability to the original program.
● Role-based task and action management – Use Kanban boards, My Actionables, and contextual workflows to ensure engineers see a prioritized, project-aware view of their work across multiple programs.
For Compliance, QA, and PMO
● Phase-gate and deliverable compliance – Enforce that mandatory documents, analyses, and formal reviews are completed and approved before phases close—critical in safety-critical, export-controlled, and sponsor-governed environments.
● Audit trail for reviews and decisions – Attach workflows to project activities and use contextual sign-off to maintain a full history of who reviewed, approved, or rejected work, and under which SOP/checklist.
● Project/Program data export for sponsors and partners – Package all relevant data—metadata, documents, and related items—into a single exportable bundle when reporting to external sponsors or collaborating organizations. or collaborating organizations”